Ayappakkam (Old) |
PROJECT LOCATION: |
Plot No: 497 & 498,
Subdivision - B, Ayapakkam,
Ambattur Phase - III |
|
PROJECT DETAILS: |
Number of flats |
: |
4 nos. (Two in each floor) |
Number of floors |
: |
Ground + 1st floor |
Car parking |
: |
4 nos. |
|
|
|
|
|
|
|
PROJECT FEATURES: |
|
Minimum no. of flats |
|
Approved by CMDA & Local Panchayat |
|
Open space on all four sides |
|
Just 2.5 kms. away from Mogappair West, Ambattur Estate & IT hub ( HCL, India Land Tech Park, Perot Systems, Prince Tech Park, TVS) |
|
Very near to reputed education institutes like DAV, Vellammal, SBOA, Spartan Schools etc., |
|
All rooms are fully ventilated |
|
Underground Sump for water storage and bore well |
|
Architecturally designed interior and exterior / as per Vaasthu |
|
Deluxe specifications |
|
Professional supervision and execution |
|
Well connected to Poonamallee High Road and Chennai Tiruvellore High Road. |
|
Project approved by LIC HFL, IDBI & AXIS, HDFC & SBI bank. Loans can be arranged from any other banks. |
|
|
BUILT UP AREA: |
Ground Floor |
: |
825 Sq.ft. (2 BHK) (Available), 990 Sq.ft. (Sold) - both flats with covered car parking |
First Floor |
: |
1,100 Sq.ft.(2 BHK) (Sold), 1,280 Sq.ft. (Sold), (3 BHK) – both flats with covered car parking |
|
|
|
|
COST DETAILS: |
COST DETAILS: |
Rate |
: |
Rs. 2,300/- per Sq.ft. –(Including car parking) Registration , E.B. & CMWSSB charges extra |
|
|
DURATION: |
Project commences on |
: |
February 2008 |
Project Handing over |
: |
September 2008 |
|
|
FOR DETAILS & BOOKING CONTACT: |
|
Mr. M. P. Anand, B.E. |
Revathy Constructions
16/12, Karthik Apartments, First Floor,
Secretariat Colony, First Street,
Kellys, Chennai -600010
Tamil Nadu, India.
Opp: ESI Hospital |
Phone No |
: |
044 - 6455 5105 |
Mobile No |
: |
+91 - 98407 56951
+91 - 99625 56951
+91 - 86951 11951 |
E - mail |
: |
|
Website |
: |
|
|
|
PROJECT SPECIFICATIONS: |
|
Teak Wood Main door for the main entrance |
|
Imported Country wood for door and window frames |
|
Seasoned and Treated flush doors for bedrooms |
|
M.S. grills for windows embedded to the frames (Instead of screwed grills which are highly unsafe) |
|
Glazed ceramic tiles (16”x 16”) for flooring in all rooms |
|
Anti-Skid tiles of size 12” x 12” for toilet flooring to ensure enhanced grip |
|
Glazed ceramic tiles of size 12” x 8” for toilet walls, above kitchen platform and wash basin counter up to 7’ 0” ht.. |
|
Separate wash basin counter in dining |
|
Wardrobes in Bedrooms and shelves in Kitchen to provide extra storage space |
|
Internal and external wall painting with Supercem, main entrance door polished, doors and windows will be painted with Asian enamel paint |
|
Three phase concealed electricity connection with ISI wires, Miniature circuit breakers, Isolators and Phase changers providing shock proof electric power supply, |
|
Concealed plumbing and sanitary lines, chromium plated taps, wall mixers, showers and Parryware or Hindware sanitary wares |
|
Space all around the building |
|
Aesthetic Elevation |
|
Bore well to provide copious well water supply |
|
Overhead tank with suction motor from the well with secured motor room |
|
Rain water Harvesting |
|
Mangalore Pressed tiles (9” x 9”) for Terrace flooring over the weathering course |
|
|
|
|
|